Tuesday, June 18, 2013

In the path of progress

I decided to winterize the path to the cottage as the main path has been to the manor.
To do so, I removed numerous rocks previously placed there 

to make way for poured cement that would transition to the older cement along the main path.
Mortar cement was placed starting at the main path and working back towards the mixer in front of the garage.
A layer of sand precedes the 2+ inches of cement. A couple of pipe conduits under the path at either end allow for future irrigation or wiring needs.
A year or two later and it looks of comparable vintage with the main path.





No comments: